Horse Walker & ARENA

The Horse Walker and Arena are slowly starting to come together. Progressive photos are shown below.

By the 27th December 2010 the drainage, the concrete foundation block for the central engine, power cables and sprinkler pipes have been completed.

  The horse walker components and engine have been delivered. All that remains is to install the walker and connect the power.

The walker has been installed but we still need to raise one side with soil to get correct levels .  The round yard is also waiting for the ground to be levelled. Last thing is to then add the sand base to both (Waiting for ground to dry out a bit).

Cosmetic finish will follow once the horses are using the facilities.

 

November / December 2010

                                                           

                   

May / June 2011